TIP S-7010 Extension to 24VDC Uninterruptible Power Supply (UPS)

Exercise Book Machine Upgrade

Machine Model for Improvement

All BW Bielomatik excercise book & spiral binding lines with mechanical gear box or electronic main drives.

Description of Improvement

This upgrade is part of the Technical Improvement Program (TIP). It reduces the restarting efforts and minimizes
rejection while ramping up the machine after an unexpected power outage.
A condenser battery is installed to ensure that the clutch and the 24V power supply is still active to perform a smooth and controlled shut down of the machine.
This reduces the load on the mechanical parts, e.g. the belts or paper jam in the overlapping section.
Additionally, by synchronized coupling a faster production start is possible.

Benefits

  • No PLC data loss
  • Controlled machine shut down
  • Reduction of the load and mechanical wear and tear
  • Easier and faster production restart

Technical Service


The BW Papersystems Service Department is a highly dedicated team of people committed to giving the best customer support in the industry. Trained technicians are available for emergency service, machine updates and maintenance.

Technicians are available throughout the world for fast response and quality service. Learn more about how our service technicians can help you.

Click here for Technical Service

Service Technician
A sheeter that we had planned especially for our lightweight specialty papers has become an all-round smart sheeter that can process even heavy grammages up to 300 gsm with maximum cutting accuracy.
Dr. Matthias Rauhut, CEO, DREWSEN SPEZIALPAPIERE, Lachendorf, Germany